Basic technical data:
- Installed boiler capacity: 14.100 kW
- Total average consumption: 12.000 MWh
- Energy savings: 13 %
- Reduction of CO2 emissions: 89%, or 3,200 t/year
- Client: private sector
- Status: self-initiative proposal submitted in 2022
The project includes the long-term supply of thermal energy for the district heating system of Negotin from the newly built boiler houses, where wood biomass and compressed natural gas (CNG) will be used as energy until the conditions for connection to the gas distribution system are met.
Engaging Negawatt Solutions
- Preparation of a preliminary feasibility study
- Preparation of the self-initiated proposal of the PPP project