(HVAC installations, stabile firefighting systems):
FIAT CHRYSLER AUTOMOBILS (FCA), Car factory, Serbia Kragujevac (total value of work 55 M€)
- Reconstruction of building 1 (MAGNETI MARELLI AND JONSON CONTROLS) total area 71.500 m²
- Reconstruction of building 2 (PRESS SHOP) total area 48.000 m²
- Reconstruction of building 3 (BODY SHOP) total area 45.000 m²
- Reconstruction of building 4 (PAINT SHOP) total area 37.500 m²
- Reconstruction of building 5 (ASSEMBLY SHOP) total area 46.000 m²
- New Liquid storage with the supply station (petrol, diesel, motor oil, oil for brake systems, cleaning fluid and HFO fluid) total area 7.500 m²
- Reconstruction of building 16 in Canteen and dressing room, total area 6000 m²
- Reconstruction of building 36 in training centre, total area 800 m²
- Reconstruction of building 19 in Show room, Kindergarden, Adinistrative building and Medical centre, total area 3500 m²
- Reconstruction of hall 10, total area 4000 m²
- Reconstruction of building 25 into oil storage, total area 250 m²
- Reconstruction of buildings 39, 58, 7, total area 5200 m²
FROHLICH TRANSKLIMA, Workshops and administrative building, Hunzenschwil, Switzerland (the value of work 110 K€, total area 2100 m²)
PIM Ivan Milutinovic HIDROINZENJERING, Workshops and administrative building, Belgrade, Serbia (the value of work 65 K€, total area 1600 m²)
JASIKOVO, Workshops and administrative building for freezing and drying of fruits, Majdanpek, Serbia (the value of work 80 K€, total area 750 m²)
VIBAC Factory for industrial packaging, Jagodina, Serbia (the value of work 1.6 M€, total area 6500 m²)